Founded in 1913, Lakeland College has seen many changes over 89 years of operation. A huge indoor riding arena on campus required a more efficient method of heating. Based on heat calculations, design layouts and comparison data provided by Qualitec Distributors in Alberta, a combination of Superior Radiant Products’ Premier VS and "L Series" infrared heating equipment was installed with not only considerable consumption savings, but vastly improved comfort conditions.
The old heating system was forced air unit heaters, total capacity for the horse barn and attached riding arena was 2,000 MBH. It was replaced with Premier VS System with a total capacity of 1,500 MBH. With two Premier VS Panels, all zones are controlled by remote sensing stats.
|